The accompanying table shows 20 of the largest upcoming Oil & Gas and Electric Power & Communications construction projects in Canada. They are all in the planning stage and are mainly new projects, but may also involve additions and/or alterations.
Shopping centers, hotels, office buildings, medical buildings, educational buildings, government buildings, industrial projects, oil and gas projects, and electric power and telecommunications projects will all be covered on a rotating basis.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Finally, total construction activity is comprised of many small- and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
Project Title and Owner/Developer |
Location | Current Stage |
Project Value canadian $ |
---|---|---|---|
KITIMAT CLEAN REFINERY | |||
Kitimat Clean Ltd | Kitimat BC | Schematic Design | $22,000,000,000 |
FRONTIER OIL SANDS MINE PROJECT | |||
Teck Coal Ltd | Fort McMurray AB | Construction Documents | $20,000,000,000 |
KWISPAA LNG | |||
Steelhead LNG | Bamfield BC | Design Development | $18,000,000,000 |
EAGLE SPIRIT OIL REFINERY AND PIPELINE | |||
Aquilini Investment Group Inc | Prince Rupert BC | Pre-Design | $14,000,000,000 |
GOLDBORO LNG – LIQUEFIED NATURAL GAS EXPORT FACILITY | |||
Pieridae Energy Canada | Goldboro NS | Construction Documents | $13,000,000,000 |
PACIFIC FUTURE ENERGY REFINERY PROJECT | |||
Pacific Future Energy | Terrace BC | Schematic Design | $10,000,000,000 |
SINOCAN GLOBAL – BITUMEN UPGRADING AND PETROCHEMICAL FACILITY | |||
Teedrum Inc. | Lamont AB | Schematic Design | $8,500,000,000 |
NORTH WEST UPGRADER – STURGEON REFINERY PHASE 2 & 3 | |||
Canadian Natural Resources Ltd | Edmonton AB | Schematic Design | $8,500,000,000 |
BAY DU NORD OIL FACILITY DEVELOPMENT PROJECT | |||
Husky Energy | St John’s NL | Schematic Design | $6,800,000,000 |
DEVON ENERGY – PIKE 1 PROJECT | |||
BP Canada Energy Group | Lac La Biche AB | Construction Documents | $4,700,000,000 |
Project Title and Owner/Developer |
Location | Current Stage |
Project Value CANADIAN $ |
---|---|---|---|
MACTAQUAC GENERATING STATION UPGRADES | |||
NB Power | Keswick Ridge NB | Schematic Design | $3,000,000,000 |
GENESEE GENERATING STATION – UNIT 4 & 5 | |||
ENMAX Power Services Corp | Luduc County AB | Design Development | $1,400,000,000 |
ONTARIO POWER GENERATION – DEEP GEOLOGIC REPOSITORY | |||
Ontario Power Generation Inc | Tiverton ON | Design Development | $1,000,000,000 |
ATCO HEARTLAND GENERATING STATION | |||
ATCO Power | Sherwood Park AB | Construction Documents | $800,000,000 |
MARMORA HYDRO PUMPED STORAGE PROJECT | |||
Northland Power Inc | Marmora ON | Construction Documents | $800,000,000 |
TAZI TWÉ HYDROELECTRIC GENERATING STATION (ELIZABETH FALLS) | |||
Black Lake Denesuline Nation | Black Lake SK | Construction Documents | $630,000,000 |
REVELSTOKE DAM & GENERATING STATION – UNIT 6 PROJECT | |||
BC Hydro and Power Authority | Revelstoke BC | Schematic Design | $582,000,000 |
SHARP HILLS WIND FARM | |||
EDP Renewables Canada Ltd. | Sedalia AB | Construction Documents | $510,000,000 |
TRAVERS SOLAR PROJECT | |||
Greengate Power Corporation | Lomond AB | Design Development | $500,000,000 |
WILD ROSE 1 – WIND POWER PROJECT | |||
NaturEner Canada | Redcliff AB | Construction Documents | $500,000,000 |
While every effort is made to ensure the correctness of ConstructConnect’s information, we have hundreds of thousands of projects in our database and some errors will occur. We greatly appreciate hearing from readers concerning updates and will make proper revisions promptly.