The accompanying table records the 10 largest construction project starts in Canada in June 2018. Also included is the latest trend graph on starts. This looks at 12-month moving totals of the civil and non-residential building categories in Canada.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
REGION (East to West) |
TYPE OF CONSTRUCTION |
DESCRIPTION |
Sq. Ft.
000s |
Dollars
000,000s |
Quebec | ||||
Montreal | Residential | NEST Condos | 135 | $35 |
(3 structures; 11 storeys; 97 units) 1200, rue Crescent | ||||
Brivia Group | ||||
Ontario | ||||
Corunna | Industrial | Nova Chemicals Polyethylene Plant Expansion | * | $1,700 |
(2 structures) 804 Rokeby Line | ||||
NOVA Chemicals Corporation | ||||
Toronto | Engineering/Civil | Don River and Central Waterfront Project – Coxwell Bypass Tunnel | * | $398 |
(1 structure) 9 Leslie St | ||||
City of Toronto | ||||
Etobicoke | Residential | Bloor Promenade at Islington Terrace Condominiums – Building Three | 600 | $104 |
(1 structure; 44 storeys; 397 units) Mabelle Ave | ||||
Tridel Group | ||||
Markham | Engineering/Civil | Highway 404 – From Major Mackenzie Drive northerly to 1.7 km north of Stouffville Road | * | $59 |
(2 structures) Hwy 401 | ||||
Ontario Ministry of Transportation | ||||
Whitby | Engineering/Civil | Highway 401 – Brock Street Underpass , Harwood Avenue to Thickson Road | * | $53 |
(4 structures) Hwy 401 | ||||
Ontario Ministry of Transportation | ||||
Grimsby | Residential | Aquazul Condominiums – Building One | 213 | $35 |
(1 structure; 6 storeys; 164 units) Casablanca Blvd | ||||
Homes By DeSantis | ||||
Manitoba | ||||
Winnipeg | Commercial | 300 / 330 Main Development | 641 | $140 |
(4 structures; 42 storeys; 6 units) 300 Main St South and 330 Main | ||||
Artis REIT Winnipeg Head Office | ||||
Saskatchewan | ||||
Spruce Lake | Industrial | Husky Energy – Spruce Lake North and Central – Thermal Bitumen Projects | * | $700 |
(1 structure) 6.5 km north of Spruce Lake | ||||
Husky Energy | ||||
British Columbia | ||||
Vancouver | Commercial | 601 West Hastings Office Tower | 228 | $51 |
(3 structures; 25 storeys; 102 units) 601 W Hastings St | ||||
PCI Developments Corp | ||||
TOTALS: | 1,817 | $3,275 |
Moving totals of the latest 12 months*
(ConstructConnect Insight Forecast Figures)

One thought on “Top 10 Largest Construction Project Starts in Canada and Trend Graph – June 2018”