Twenty Major Upcoming Atlantic and Manitoba, Saskatchewan Construction Projects – Canada – May 2016

The accompanying table shows 20 of the largest upcoming Atlantic and Manitoba, Saskatchewan construction projects in Canada. They are all in the planning stage and are mainly new projects, but may also involve additions and/or alterations.

2016 05 27 May Top 10 Canada GraphicShopping centers, hotels, office buildings, medical buildings, educational buildings, government buildings, industrial projects, oil and gas projects, and electric power and telecommunications projects will all be covered on a rotating basis.

There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.

Finally, total construction activity is comprised of many small- and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.

Ten of the largest upcoming Atlantic construction projects

Project Title and
Owner/Developer
Location Current

Stage
Project
Value
canadian $
HYDROELECTRIC GENERATING STATION      
Lower Churchill Project – Phase 2      
Nalcor Energy Division No 1, Subd G NL Schematic Design $12,000,000,000
LIQUEFIED NATURAL GAS EXPORT FACILITY      
Goldboro LNG      
Pieridae Energy Canada Halifax County NS Schematic Design $5,000,000,000
GAS PLANT      
Bear Head Liquefied Natural Gas      
Liquefied Natural Gas Ltd Richmond, Subd A NS Construction Documents $4,000,000,000
HYDROELECTRIC DAM ALTS      
Mactaquac Generating Station      
NB Power Kingsclear, parish NB Pre-Design $3,000,000,000
MINE      
Kami Iron Ore Project      
Alderon Iron Ore Corp Division No 10 NL Schematic Design $1,300,000,000
MINE      
Sisson Mine Project      
Northcliff Resources Ltd Douglas NB Pre-Design $600,000,000
MINE      
Voisey’s Bay Mine      
Vale Newfoundland Operations Division No 10 NL Pre-Design $500,000,000
MINE      
Donkin Export Coking Coal Project      
Kameron Colliers ULC Cape Breton NS Pre-Design $500,000,000
MIXED USE DEVELOPMENT      
King’s Wharf      
Fares Inc Dartmouth NS Schematic Design $500,000,000
MARINE TERMINAL      
Canaport Energy East Marine Terminal      
TransCanada Energy Ltd Saint John NB Pre-Design $300,000,000

Ten of the largest upcoming Manitoba, Saskatchewan construction projects

Project Title and
Owner/Developer
Location Current

Stage
Project
Value
CANADIAN $
GENERATING STATION      
Keeyask Generating Station- Phase 2      
Manitoba Hydro Split Lake 171 MB Construction Documents $4,600,000,000
LIQUEFIED NATURAL GAS FACILITY      
Gascana LNG      
Petrox Resources Corp Sturgeon Lake 101 SK Pre-Design $4,000,000,000
POTASH MINE, MINE MILL BUILDING & POWER PLANT      
Muskowekwan Potash Mine Reserve Project      
Encanto Potash Corp Muskowekwan 85 SK Schematic Design $2,800,000,000
FERTILIZER PLANT      
near Belle Plaine      
Farmers of North America Belle Plaine SK Schematic Design $1,700,000,000
BRIDGES & ROADWORK      
Saskatoon Freeway Project – Northern Route      
SK Min Highways & Infras Saskatoon SK Pre-Design $1,000,000,000
BRIDGES & ROADWORK      
Saskatoon Freeway Project – Southern Route      
SK Min Highways & Infras Saskatoon SK Pre-Design $1,000,000,000
HYDROELECTRIC GENERATING STATION      
Tazi Twé Hydroelectric Generating Station (Elizabeth Falls)      
SaskPower Corp Division No 18 SK Construction Documents $630,000,000
WASTEWATER TREATMENT PLANT ALTS      
North End Water Pollution Control Centre      
City of Winnipeg (Mats Mgmnt) Winnipeg MB Schematic Design $600,000,000
CONDOMINIUM APARTMENT, TOWNHOUSES, COMMERCIAL DEVELOPMENT      
SomerSet Neighbourhood      
Earth King Investments Ltd Regina SK Pre-Design $500,000,000
MIXED-USE DEVELOPMENT      
True North Square Towers One and Two      
CentreVenture Development Corp Winnipeg MB Schematic Design $400,000,000

All of the above projects share the same common factors. They are all in the planning stage. They are mainly new projects but may also involve additions and/or alterations. Shopping centers, hotels, office buildings, medical buildings, educational buildings, government buildings, industrial projects, oil and gas projects, and electric power and telecommunications projects will all be covered on a rotating basis.
Data source: ConstructConnect/Tables: ConstructConnect.

Leave a Reply