The accompanying table shows 20 of the largest upcoming Atlantic and Manitoba, Saskatchewan construction projects in Canada.
They are all in the planning stage and are mainly new projects, but may also involve additions and/or alterations.
Shopping centers, hotels, office buildings, medical buildings, educational buildings, government buildings, industrial projects, oil and gas projects, and electric power and telecommunications projects will all be covered on a rotating basis.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when jobsite work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Finally, total construction activity is comprised of many small- and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
Project Title and Owner/Developer |
Location | Current Stage |
Project Value canadian $ |
---|---|---|---|
GOLDBORO LNG – LIQUEFIED NATURAL GAS EXPORT FACILITY | |||
Pieridae Energy Canada | Goldboro NS | Construction Documents | $5,000,000,000 |
BEAR HEAD LNG PROJECT | |||
Head Painters Inc | Halifax NS | Construction Documents | $4,000,000,000 |
MACTAQUAC GENERATING STATION | |||
NB Power | Fredericton NB | Schematic Design | $3,000,000,000 |
NEWFOUNDLAND – LABRADOR TUNNEL | |||
Department of Transportation and Works | Flowers Cove NL | Schematic Design | $1,500,000,000 |
KAMI IRON ORE PROJECT | |||
Alderon Iron Ore Corp | Labrador City NL | Construction Documents | $1,300,000,000 |
KING’S WHARF MIXED USE DEVELOPMENT | |||
Fares Inc. | Dartmouth NS | Design Development | $500,000,000 |
WATERFORD HOSPITAL REPLACEMENT | |||
Eastern Health | St. John’s NL | Schematic Design | $325,000,000 |
CANAPORT ENERGY EAST MARINE TERMINAL | |||
TransCanada | Saint John NB | Schematic Design | $300,000,000 |
RIVERHEAD WASTEWATER TREATMENT PLANT | |||
City of St. John’s | St. John’s NL | Design Development | $200,000,000 |
LOWER CHURCHILL GENERATION FACILITY DEVELOPMENT PHASE 2 | |||
Nalcor Energy | Lower Island Cove NF | Schematic Design | $200,000,000 |
Project Title and Owner/Developer |
Location | Current Stage |
Project Value CANADIAN $ |
---|---|---|---|
MUSKOWEKWAN POTASH MINE RESERVE PROJECT | |||
Muskowekwan First Nation | Lestock SK | Design Development | $2,800,000,000 |
KRONAU POTASH MINE PROJECT | |||
Vale Potash Canada Ltd | Lajord SK | Design Development | $2,500,000,000 |
SASKATOON FREEWAY PROJECT – SOUTHERN ROUTE | |||
Saskatchewan Ministry of Highways and Infrastructure | Saskatoon SK | Schematic Design | $1,000,000,000 |
SASKATOON FREEWAY PROJECT – NORTHERN ROUTE | |||
Saskatchewan Ministry of Highways and Infrastructure | Saskatoon SK | Schematic Design | $1,000,000,000 |
TAZI TWÉ HYDROELECTRIC GENERATING STATION (ELIZABETH FALLS) | |||
Black Lake Denesuline Nation | Black Lake SK | Construction Documents | $630,000,000 |
NORTH END WATER POLLUTION CONTROL CENTRE | |||
City of Winnipeg | Winnipeg MB | Design Development | $600,000,000 |
SOMERSET NEIGHBOURHOOD CONCEPT PLAN | |||
Earth King Investments Ltd | Regina SK | Schematic Design | $500,000,000 |
REGINA PIPELINE EXPANSION | |||
SaskEnergy Incorporated | Regina SK | Schematic Design | $425,000,000 |
PEA PROCESSING PLANT IN PORTAGE LA PRAIRIE | |||
Regional Municipality of Portage la Prairie (Owner’s Rep) | Portage La Prairie MB | Schematic Design | $400,000,000 |
MIDWEST MINE PROJECT | |||
AREVA Resources Canada Inc | Saskatoon SK | Design Development | $400,000,000 |