The accompanying table shows 20 of the largest upcoming Oil & Gas and Electric Power & Communications construction projects in Canada. They are all in the planning stage and are mainly new projects, but may also involve additions and/or alterations.
Shopping centers, hotels, office buildings, medical buildings, educational buildings, government buildings, industrial projects, oil and gas projects, and electric power and telecommunications projects will all be covered on a rotating basis.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when jobsite work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Finally, total construction activity is comprised of many small- and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
Project Title and Owner/Developer |
Location | Current Stage |
Project Value canadian $ |
---|---|---|---|
KITIMAT CLEAN REFINERY PROJECT | |||
Kitimat Clean Ltd | Kitimat BC | Schematic Design | $29,000,000,000 |
FRONTIER PROJECT – PHASE 1-3 | |||
Teck Coal Ltd | Fort McMurray AB | Schematic Design | $17,250,000,000 |
ELLS RIVER OILS SANDS FACILITY | |||
Chevron Canada Ltd | Fort Mackay AB | Schematic Design | $16,800,000,000 |
GRASSY POINT LNG FACILITY | |||
Woodside Energy Holdings Ltd | Prince Rupert BC | Schematic Design | $15,000,000,000 |
EAGLE SPIRIT OIL REFINERY AND PIPELINE | |||
Aquilini Investment Group Inc | Prince Rupert BC | Schematic Design | $14,000,000,000 |
SASOL NATURAL GAS-TO-LIQUIDS REFINERY – PHASE 1 | |||
Sasol Canada | Fort Saskatchewan AB | Design Development | $12,500,000,000 |
PACIFIC NORTHWEST LNG | |||
Progress Energy Resources Corp | Port Edward BC | Construction Documents | $11,000,000,000 |
PACIFIC FUTURE ENERGY REFINERY PROJECT | |||
Pacific Future Energy | Terrace BC | Schematic Design | $10,000,000,000 |
NORTH WEST UPGRADER – STURGEON REFINERY PHASE 2 & 3 | |||
Canadian Natural Resources Ltd | Edmonton AB | Schematic Design | $10,000,000,000 |
PRINCE RUPERT NATURAL GAS TRANSMISSION PIPELINE | |||
Progress Energy Resources Corp | Port Edward BC | Design Development | $5,000,000,000 |
Project Title and Owner/Developer |
Location | Current Stage |
Project Value CANADIAN $ |
---|---|---|---|
KITSAULT ENERGY LNG PROJECT – PHASE 2 | |||
Kitsault Energy | Dome Creek BC | Schematic Design | $5,000,000,000 |
PETIT-MÉCATINA HYDROELECTRIC COMPLEX | |||
Hydro-Québec | Blanc-Sablon QC | Schematic Design | $3,600,000,000 |
MACTAQUAC GENERATING STATION | |||
NB Power | Fredericton NB | Schematic Design | $3,000,000,000 |
HR MILNER GENERATING STATION EXPANSION (M2) | |||
Maxim Power Corp | Grande Cache AB | Construction Documents | $1,400,000,000 |
HACKNEY HILLS WIND PARK | |||
Aeolis Wind Power Corporation | Fort St John BC | Schematic Design | $1,000,000,000 |
THUNDER MOUNTAIN WIND PROJECT | |||
Aeolis Wind Power Corporation; Brookfield Renewable Power Inc | Tumbler Ridge BC | Schematic Design | $1,000,000,000 |
BOW CITY POWER PROJECT | |||
Bow City Power Ltd | Brooks AB | Schematic Design | $800,000,000 |
ATCO HEARTLAND GENERATING STATION | |||
ATCO Power | Sherwood Park AB | Schematic Design | $800,000,000 |
THUNDER MOUNTAIN SOUTH | |||
Aeolis Wind Power Corporation | Tumbler Ridge BC | Schematic Design | $750,000,000 |
ENERGY GENERATING FACILITY: MARMORA PUMP STORAGE | |||
Northland Power Inc; Aecon Industrical | Marmora ON | Design Development | $660,000,000 |