The accompanying table records the top 10 project starts in the U.S. for April 2019.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when jobsite work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
Click here to download the Construction Industry Snapshot Package – April 2019 PDF.
Click here for the April 2019 Industry Snapshot article, Construction Starts Settled into More Normal Pattern in April, +3% M/M.
Click here for the Nonresidential Construction Starts Trend Graphs – April 2019.
LOCATION (East to West) |
TYPE OF CONSTRUCTION |
DESCRIPTION |
Sq. Ft.
000s* |
Dollars
000,000s |
New York | ||||
Bowling Green | Civil/Engineering | Canarsie Tunnel Rehabilitation and Core Capacity Improvements | * | $477 |
(1 structure) Multiple Locations | ||||
MTA – New York City Transit – Procurement Division | ||||
Maryland | ||||
Accokeek | Civil/Engineering | Piscataway Wastewater Treatment Plant Bio-energy Project for the Washington Suburban Sanitary Commission (WSSC) | * | $250 |
(2 structures) 11 Farmington Rd W | ||||
Washington Suburban Sanitary Commission Administration | ||||
District of Columbia | ||||
Washington | Residential | City Ridge (Former Fannie Mae Site) | 315 | $640 |
(4 structures; 802 units) 3900 Wisconsin Ave NW | ||||
Roadside Development | ||||
South Carolina | ||||
Moncks Corner | Commercial | Google Data Center Expansion/ Moncks Corner | 2,477 | $600 |
(1 structure) 1669 Garrott Ave | ||||
Google Inc. – Mountain View | ||||
Florida | ||||
Miami | Residential | Okan Tower | 1,260 | $300 |
(6 structures; 70 stories; 1498 units) 555 N Miami Ave | ||||
Miami 6th LLC | ||||
Avon Park | Industrial | Nucor Rebar Micro Mill / Frostproof | 256 | $240 |
(1 structure) Piitsburg Rd & Retreat Rd | ||||
Nucor Corporation | ||||
Kentucky | ||||
Hebron | Industrial | Amazon Prime Air Hub Distribution Center – CVG Airport / Hebron | 3,350 | $1,500 |
(1 structure) 3087 Terminal Dr | ||||
Cincinnati Northern Kentucky International Airport | ||||
Texas | ||||
Bellmead | Civil/Engineering | IH-35 From South 12th Street to North Loop 340 CSJ 0015-01-243 Texas Department of Transportation | * | $448 |
Multiple Locations | ||||
Texas Department of Transportation – Waco District Office | ||||
Lorena | Civil/Engineering | Wdn, Gr, Strs, and Surf, I-35 | * | $341 |
Texas Department of Transportation / Austin | ||||
Fannin | Civil/Engineering | Bois d’Arc Lake – Raw Water Pipeline and Leonard WTP to McKinney No. 4 Treated Water Pipeline | * | $293 |
North Texas Municipal Water District | ||||
TOTALS: | 7,658 | $5,089 |