Top 10 Project Starts in the U.S. – August 2017

The accompanying table records the top 10 project starts in the U.S. for August 2017.

2017-09-14-Top-10-US-Projects-August-2017

There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when jobsite work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.

Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.

Click here to download the Construction Industry Snapshot Package – August 2017 PDF.

Click here for the August 2017 Industry Snapshot article, In August, ConstructConnect’s Starts -10% vs July, but +2% Ytd.

Click here for the Nonresidential Construction Starts Trend Graphs – August 2017.

Top 10 project starts in the U.S. – August 2017
LOCATION
(East to

West)
TYPE OF
CONSTRUCTION
DESCRIPTION
Sq. Ft.
000s*
Dollars
000,000s
New York
Dover Plains Engineering/Civil Cricket Valley Energy – Electric Power Plant               * $1,584
(4 structures) 22410 Rte 22
Advanced Power Services
 
New York Residential Lexington Gardens 2               412 $195
(1 structure; 15 stories; 400 units) 1477 Park Ave
Tahl Propp Equities
         
North Carolina
Charlotte Residential Liberty Charlotte South Park               457 $205
(3 structures; 9 stories; 685 units) 6010 Fairview Rd
Liberty Senior Living
         
Michigan
Saginaw Engineering/Civil Saginaw Trail Pipeline  *  $610
Michigan Public Service Commission
 
Grayling Industrial Arauco MDP Plant               820 $400
(1 structure) 4440 W 4 Mile Rd.
Arauco North America
         
Alabama
Birmingham Engineering/Civil CBD I-20 /59 Bridge Replacements and Approaches (Phase III)  *  $475
(4 structures) 
Alabama Department of Transportation (ALDOT)
         
Minnesota
Minneapolis Engineering/Civil TH 35W from 72 Ft S of E 43rd St to 520 Ft E of Chicago Ave S  *  $239
(4 structures) TH 35W
Minnesota Department of Transportation – Metro District
         
Texas
Dallas Engineering/Civil Phase III-B Solids Management Improvements  *  $196
(2 structures) 6500 W Singleton Blvd
Trinity River Authority
         
Oregon
Portland Retail Hyatt Regency               440 $220
(2 structures; 20 stories; 1,019 units) 777 NE Martin Luther King Jr Blvd
Schlesinger Companies
         
California
Culver City Residential Ivy Station               500 $300
(6 structures; 16 stories; 1,948 units) 8824 National Blvd
Lowe Enterprises Real Estate Main Office
 
TOTALS:     2,629 $4,424
*A square footage measure does not apply for alteration and engineering/civil work.
Data source and table: ConstructConnect.

Leave a Reply