The accompanying table records the top 10 project starts in the U.S. for June 2018.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
Click here to download the Construction Industry Snapshot Package – June 2018 PDF.
Click here for the June 2018 Industry Snapshot article, ConstructConnect’s 1st Half Starts: Non-res Building, -14%; But Heavy Engineering, +13%.
Click here for the Nonresidential Construction Starts Trend Graphs – June 2018.
LOCATION (East to West) |
TYPE OF CONSTRUCTION |
DESCRIPTION |
Sq. Ft.
000s* |
Dollars
000,000s |
Maine | ||||
Portland | Institutional | Maine Medical Center Addition | 1,734 | $512 |
(2 structures; 5 stories) 22 Bramhall St | ||||
Maine Medical Center-Portland | ||||
Pennsylvania | ||||
Allentown | Residential | Five City Center – Urban Innovation Campus | 442 | $225 |
(4 structures; 33 stories; 1,100 units) 8th St and Hamilton St | ||||
City Center Investment Corp. | ||||
Virginia | ||||
Richmond | Institutional | VCU Adult Outpatient Facility | 603 | $349 |
(1 structure; 16 stories) 515 N 10th St | ||||
VCU Health System Capital Programs | ||||
Ohio | ||||
Toledo | Industrial | Hot Briquette Iron Processing Plant | 33 | $700 |
(1 structure) 2863 Front St | ||||
Toledo-Lucas County Port Authority | ||||
North Dakota | ||||
Ellendale | Engineering/Civil | Foxtail Wind Energy Center | * | $276 |
Xcel Energy | ||||
Nevada | ||||
Las Vegas | Commercial | Caesars Forum | 550 | $375 |
(1 structure) 3535 S Las Vegas Blvd | ||||
Caesars Entertainment Corp. | ||||
Washington | ||||
Seattle | Residential | 1200 Stewart Street | 1,030 | $300 |
(4 structures; 41 stories; 1,667 units) 1200 Stewart St | ||||
GC Graham Group Ltd. | ||||
California | ||||
Los Angeles | Engineering/Civil | Westside Purple Line Extension Section 2 Project | * | $1,377 |
(1 structure) Multiple locations | ||||
LA County Metropolitan Transportation Authority | ||||
La Jolla | Institutional | Sixth College North Torrey Pines Living and Learning Neighborhood | 1,500 | $490 |
(2 structures; 14 stories) 2880 Torrey Pines Scenic Dr | ||||
UC-San Diego, Facilities Design and Construction | ||||
Oakland | Residential | MacArthur Transit Village Parcel B (fka MacArthur Mammoth) | 501 | $265 |
(3 structures; 24 stories; 638 units) 532 E 39th St | ||||
Boston Properties/McGrath Properties | ||||
TOTALS: | 6,393 | $4,869 |
One thought on “Top 10 Project Starts in the U.S. – June 2018”